Beijing Environmental Improvement Project
Description:
This project is designed to cut emissions of SO2, NOx, CO2, etc., by substituting the small coal-burning boilers used in Beijing Electronic Zone, which the Beijing Municipal People's Government is prohibiting, with cogeneration equipment that uses natural gas. The government plans to ban 102 of the 128 small coal-burning boilers currently in operation, resulting in an estimated reduction in coal consumption of 300,000 tons annually.
This project represents the first full-scale implementation of natural gas cogeneration in Beijing, and it is positioned as a model to encourage the future spread of similar cogeneration facilities from the standpoint of environmental protection and energy conservation.
Project Proponent:
Japan Bank For International Cooperation (JBIC)
Objectives:
Total Budget:
|
|
$
|
$67,560.79
|
Funding Sources / Donors:
1. JBIC
Funding Type:
• Loan
Status of Project:
|
|
Ongoing
|
|
|
Implementing Agencies:
Regions Covered:
Countries Covered:
Cities Covered:
Contact Person(s):
|
Areas of Focus
The topics covered by this specific Project / Program are listed below. Click on a link to see other Projects / Programs under the same category.
|